Request for Proposal (RFP) for Owner’s Engineer Consultancy Services

Background

CERIM Luderitz Energy (Propriety) Limited (hereafter referred to as “the Client” or “the Owner”) is now conducting a public procurement for Owner’s Engineer consultancy services for the 50MW Wind Power Project in Lüderitz, Namibia. The relevant information is explained as follows:

The 50MW Wind Power Project (hereafter referred to as “the Project”) is situated approximately 16.5 kilometers south of Lüderitz, within the Karas Region of Namibia. Covering a total area of approximately 743 hectares, the Project will be developed under a Build-Own-Operate-Transfer (BOOT)model.

The Project will deploy seven Goldwind GWH175-7.8MW wind turbines, featuring semi-direct drive, medium-speed, permanent magnet technology. In addition to the turbines, the scope includes all associated civil works, a substation, and overhead transmission line infrastructure required for grid integration.

An Engineering, Procurement, and Construction (EPC) delivery model will be adopted, whereby the Owner will engage a single EPC contractor through a competitive bidding process to execute the full scope of works.

Download Annex

In addition to the Request for Proposal download the following documents:

  1. Section 1 of Annex 3:Proposed work allocations
  2. Section 2 of Annex 3:Contract for consultancy services
  3. Section 2 of Annex 3:IV.GENERAL CONDITIONS – FIDIC Fourth Edition (2006 WHITE BOOK)

All documents should be submitted to both  cerim@ceecic.com AND tenders@anirep.com

For enquiries contact +264 61 301 445

Please kindly note that submission date for bidding documents has been extended to 7th October 2025, 17:00, Namibia Time.